Construction Drawings Design and Total Cost Estimate for the Aerodrome Beacon System and ILS Project - Tho Xuan Airport;
Construction Drawings Design and Total Cost Estimate for the Investment of ILS/DME and Approach Lighting System CAT I of Runway end 29L – Noi Bai International Airport;
Construction Drawings Design and Total Cost Estimate for the ILS Equipment of Runway 07R/25L – Tan Son Nhat International Airport;
Construction Drawings Design for the Project of Modernization of Military Airfield Beacon System for Night Operations invested by Air Force Service;
Survey and Preparation of Eco-Technical Report on Taxiway Beacon System – Cam Ranh International Airport;
Construction Drawings Design and Flight Procedure Design for the Runway 35L ILS/DME Project – Da Nang International Airport
Supervision of Construction and Equipment Installation for the Runway 35L ILS/DME Project – Da Nang International Airport
Construction Drawings Design for ILS Project – Chu Lai Airport
Construction Drawings Design and Flight Procedure Design for the Project of ILS Equipment and Aerodrome Beacon System CAT I Upgrading – Phu Cat Airport
Survey, Construction Drawings Design and Flight Procedure Design for the Aerodrome Beacon System and ILS Project – Tuy Hoa Airport
Survey and Preparation of Eco-Technical Report for Construction of Automated Weather Observing System (AWOS) – Ca Mau Airport;
Survey and Preparation of Eco-Technical Report for Construction of Automated Weather Observing System (AWOS) – Rach Gia Airport;